A Drilling Derrick Specialist
We are extremely proud of the reputation that Global 1 has achieved with our customers over the years. Our offshore personnel, the rope access technicians, and the personnel behind the scenes that all contribute to the successful completion of all work scopes undertaken by Global 1
Global 1 are the go-to company for all Derrick and Mast related work scopes, no matter the complexity and location. Our customers can rest assured that all work scopes are carefully planned and completed in line with the industry standards and recommendations, by some of the industry’s most experienced personnel.
“As drilling Derrick specialist, we at Global 1 aim to provide our customers with the best quality, safest, and most cost-efficient solutions for whatever our customer’s requirements are, whether it’s supply of Engineering Services, Derrick Upgrades or Refurbishment, Inspections and Surveys, or Equipment sales. We at Global 1 offer the highest level of support and integrity available, both for offshore and onshore needs.”
All Global 1 personnel are multi skilled rope access construction teams, our rope construction personnel are experienced in Assembling, installation, and outfitting Derricks wherever required in the world. Global 1 customer range from Derrick Manufacturers, Shipyards and Drilling Contractors.
CMC removals can be a very complex operation which requires in-depth pre planning and preparations to ensure that the work scopes are completed professionally, efficiently and above all safely. Global 1’s experience and extensive knowledge of CMC Removals over the years has enhanced our pre-planning risk assessments, operational procedures and detailed lift planning.
With a combined management experience of over 60 years the Global 1 management Team has upgraded, modified, repaired, re-certified & inspected all types of Drilling structures, The Global 1 team has completed various Derrick & Mast upgrades over the years, covering every element of the work-scope from the initial survey, to the structural analysis, right through to procurement and fabrication of equipment and materials, to the Installation and completion of the upgrade project.
Global 1 Multi Skilled rig building, Rope Access Derrick Technicians have extensive experience in Derrick assembly, outfitting, decommissioning, extending and modifying Derricks and Land Rigs. The Global 1 technician Teams are continually trained and safety assessed, with our in-house training covering an array of different work scopes and scenarios, including Derrick Assembly, Crown Block Removal and Installation, Racking Board Removal, Guide Rails Installation, Derrick Bolts Inspections and Replacement to name but some of work scopes.